News

Multi -level stretch ceiling

Multi -level ceilings include various types of meaning. Hypsum plasterboard ceilings allows you to change or make any design of the room, giving the ceiling any shape and unusual beautiful shape. The ceiling configuration can choose any, according to your own sketches and to your taste. Creating sketches, you yourself decide how height and shape your ceiling will be.

Apart from the suspended ceilings, they are in demand for two -level stretch ceilings. During installation, the first degree can be lowered from 3 to 6 cm, and if the ceilings are low and conditionally even, then they will be able to serve as the first level.

The second level drops 10 cm from the level of the main. After you are orienting with the shape of the ceiling, it is necessary to indicate the placement of lamps. Then you need to make all the necessary measurements and make a design drawing with a very clear indication of the size and location of the profiles from the sketches, which will become the frame of your future ceiling. The same according to the finished drawing, we make markings on the ceiling. So that later the guide profiles are mounted evenly, strictly horizontally, the marking of their placement on the ceiling is made with support for the laser or hydraulic level.

The main lighting of the ceiling is installed in the center, and additional round lamps will be placed at the second figure level. A label is applied to the ceiling for attaching the contacting profile for drywall. The distance between the profile must be no more than 60 cm.

The main level, which is the upper one, is attached on pendants. The guides are fastened with self -tapping screws to give the stiffness of the system. The profile should bend according to the intended marking and fasten to the ceiling. There should not be sharp parts at the place of passage, they can destroy it.

Then the base is lined with drywall with the support of self -tapping screws. At first, a curved second level is sheathed. On the inside of a piece of drywall, cuts are applied with a knife, which are later moistened with water. After 15 minutes. the material is made ellastic and they can start a skin. In the process of lining, you need to remember about the places of spread of lamps and markings. After the casing, all seams are removed.

Then the ceiling is putty and grinds. Then the ceiling is primed. Stain in a few steps, each – until completely dry. The final stage is the installation and connection of lamps.

Related posts
News

Alternative to complex repair: plastic panels

PVC panels that appeared on the Russian market quickly gained extraordinary popularity.
News

Construction of fiberglass pools

In the mid-1950s, after a series of experiments of the Canadian scientists group, material with phenomenal qualities was born-fiberglass.
News

Plaster - types and application

The most common method of finishing is the plaster of the ceiling and walls.